ON.energy Secures 5GW Transformer Supply Deal to Accelerate AI Data Center Power Infrastructure25 Dec 2025
VoltaGrid and Halliburton Secure 400MW Manufacturing Capacity for AI Data Center Power Systems25 Dec 2025
Bitzero, Backed by Kevin O'Leary, Secures Low-Cost 10MW Power Deal for Norwegian Data Center25 Dec 2025
Hut 8 selects Entergy, Southeast Louisiana for $10 billion artificial intelligence data center25 Dec 2025
Scala AI City: Brazil’s Ministry of Mines and Energy approves 5 GW power connection for data center city in Rio Grande do Sul19 May 2025
ON.energy Secures 5GW Transformer Supply Deal to Accelerate AI Data Center Power Infrastructure25 Dec 2025
VoltaGrid and Halliburton Secure 400MW Manufacturing Capacity for AI Data Center Power Systems25 Dec 2025
Bitzero, Backed by Kevin O'Leary, Secures Low-Cost 10MW Power Deal for Norwegian Data Center25 Dec 2025
Hut 8 selects Entergy, Southeast Louisiana for $10 billion artificial intelligence data center25 Dec 2025
Scala AI City: Brazil’s Ministry of Mines and Energy approves 5 GW power connection for data center city in Rio Grande do Sul19 May 2025