PowerBridge has begun construction on Alpha Digital, a flagship multi-gigawatt powered land campus near Pecos in Reeves County, West Texas, marking a significant step in the convergence of energy infrastructure and digital development in the Permian Basin region. The project underscores a growing industry trend in which power generation and data center capacity are developed in tandem rather than as separate undertakings.
The company announced last week that it had broken ground on the campus, with initial site work having commenced last month. Spanning approximately 3,400 acres, Alpha Digital is designed to deliver more than 2GW of new co-located power generation, electrical infrastructure, and fiber conduit. The initial phase is expected to comprise 300MW of generation capacity, with first power anticipated in the fourth quarter of 2027 and deployment continuing through the first half of 2028. The site carries the option to expand over time.
PowerBridge, formed last year to develop large-scale data center campuses on land owned by LandBridge, is led by Alex Hernandez, who previously founded and served as CEO of Cumulus Data and as CEO of Talen Energy. The campus is situated in close proximity to the Waha natural gas hub, a key pricing point for natural gas in the region. PowerBridge is developing the powered campus and supporting infrastructure, while future data center buildings are set to be developed by other parties and customers. No end-users have been announced to date.
The project involves partnerships with Liberty Energy and TOPSFiber. Liberty Energy subsidiary Liberty Power Innovations is set to design, develop, and operate scalable, modular natural gas power generation architecture at the campus under a joint venture partnership with PowerBridge. The campus also aims to export excess energy to the grid and to use non-potable water for cooling via a closed-loop system. Liberty Energy CEO Ron Gusek described the project as "the convergence of two enormous industries: energy and digital infrastructure." TOPSFiber, in its own statement, emphasized that projects of such magnitude require vision, strategic planning, coordination, and strong partnerships, adding that the company was proud to be part of the effort driving growth.
The initiative reflects a broader shift in how large-scale computing capacity is being brought online in the United States, with powered land campuses increasingly positioned as a model that integrates generation, transmission, and fiber connectivity from the outset. By co-locating power generation with digital infrastructure and allowing third parties to develop data center buildings on site, the Alpha Digital campus could serve as a template for accelerating deployment timelines in a market where grid interconnection queues and power availability have become critical constraints. PowerBridge was formed by NYSE-listed landholding company LandBridge, itself established in 2021 by Texas-based private equity and infrastructure investor Five Point Infrastructure. LandBridge owns approximately 320,000 surface acres across Loving, Winkler, Reeves, Pecos, and Andrews Counties in Texas, as well as Lea County, New Mexico, located primarily in the heart of the Delaware sub-region of the Permian Basin. Five Point Infrastructure, founded in 2012, has approximately $8 billion of assets under management across multiple investment funds.
